Sizing Result
✓ TARGET MET99.9578% achieved vs 99.900% required
Min. generators needed (k)26 units
Total installed (N)34 units
RedundancyN+8
Reliability achieved99.9578%
Downtime estimate3h 42min / yr
Installed capacity (net)145.78 MW
Required capacity100.00 MW
Reserve capacity+31.20 MW (+31.2%)
Est. CapEx (at installed cap.)~$158.3M
Reliability vs Fleet Size
Y: system reliability (%) · X: total generators (N) · k=26 units required for load